Elwha River reborn as landscape transforms

Seattle Times reporter Lynda Mapes took her turn on the Elwha Dam removal story with this weekend’s “Elwha River reborn as landscape transforms

http://seattletimes.nwsource.com/html/localnews/2015718925_elwha25m.html 

“The river, tumbling and even kicking up a little white water, breaking a century’s silence in the landscape of former Lake Aldwell. ‘First, the sound,’ said Brian Cluer of NOAA fisheries, surveying the delta last week, ‘then the salmon.’"

Rising sea, stronger storms hammering West Coast shorelines

Rising sea, stronger storms hammering West Coast shorelines” a report by Monica Spain on KPLU about a news study by the U.S. Geological Survey on winter storms on the Pacific Coast. “Sea level is rising and also, in parallel to that, larger and more frequent storms – that combined with the higher sea levels – is likely to result in a series of winters that are going to have quite extreme erosion,” says Patrick Barnard of the USGS.

 http://www.kplu.org/post/rising-sea-stronger-storms-hammering-west-coast-shorelines

Clallam County rolls out draft stormwater plan

—-
4/19 Peninsula Daily News
Clallam County rolls out draft stormwater plan
By Rob Ollikainen

Peninsula Daily News
PORT ANGELES — Clallam County lawmakers received a draft stormwater management plan that aims to help the county and its residents prevent flooding, improve water quality and preserve aquatic habitat.

County planners presented to commissioners the 65-page document — the result of an Environmental Protection Agency grant and a 25- to 30-member work group that held 11 public meetings from April 2010 to March 31.

More at
http://www.peninsuladailynews.com/article/20110419/news/304199990/clallam-county-rolls-out-draft-stormwater-plan

Public comment meetings on Olympic Coast National Marine Sanctuary Draft Management Plan

Olympic Coast National Marine Sanctuary (OCNMS) will host public meetings in Port Angeles (February 23) and Forks (February 24) to hear public comment on its Draft Management Plan (DMP) and Proposed Rule (proposed changes to sanctuary regulations).  The meetings are opportunities for interested people to learn more about the DMP and Proposed Rule, speak directly to sanctuary staff, and most importantly provide sanctuary staff with ideas on how to improve the DMP.  Meetings will begin informally, with an opportunity for attendees to talk with sanctuary staff, followed by a brief introduction by George Galasso, Acting Sanctuary Superintendent.  At approximately 6:30 pm, members of the public will be provided opportunity to provide their comments and recommendations.
 
Port Angeles, February 23 6 pm to 9 pm; Clallam County Courthouse, 223 E. Fourth Street, Commissioner’s meeting room (#160). (Note: the after-hours entrance to the Courthouse is via Fourth Street, to the left of the flag poles near the main courthouse entrance).
Forks, February 24 6 pm to 9 pm; Washington Department of Natural Resources Community Room, 411 Tillicum Lane. 
 
On January 14, 2011, OCNMS released a Draft Management Plan (DMP) that is largely based on recommendations developed by its Advisory Council through an intensive working group and workshop process (see http://olympiccoast.noaa.gov/AboutUs/sac/sac_actions.html).  When finalized, this management plan will serve as a guide to OCNMS management on its activities for the next 5 to 10 years.
 
Proposed revisions to OCNMS regulations (referred to as the Proposed Rule) also were developed while reviewing our existing management plan and regulations.  The DMP and proposed regulatory changes formed a framework around which OCNMS staff wrote a Draft Environmental Assessment (DEA) document that accompanies the DMP and Proposed Rule and includes all of the federal compliance documentation to accompany the DMP.  A January 14th Federal Register notice announced availability of the DMP, DEA and Proposed Rule for public comment (Regulation Identification Number RIN 0648-BA20). 
This notice marks the end of the development phase of the management plan and the beginning of the public review phase.  These documents provide for the public to review a tangible expression of the Sanctuary’s vision for the next five to ten years.
We encourage interested members of the public to comment on the Proposed Rule and DMP/DEA.  These documents and updated information on the management plan review process is available at our web site http://olympiccoast.noaa.gov/protection/mpr/welcome.html
All comments on the Proposed Rule and DMP/DEA be received or postmarked by March 25, 2011.
 
In addition to comment at the public meetings, you may submit comments in the following ways:
·         Electronic Submissions: Submit all electronic public comments via the Federal eRulemaking Portal http://www.regulations.gov.  Follow the instructions for submitting comments.
·         Fax: 360-457-8496, Attn:  George Galasso
·         Mail: George Galasso, Olympic Coast National Marine Sanctuary, 115 East Railroad Avenue, Suite 301, Port Angeles, WA 98362
 
For more information, email us at ocnmsmanagementplan@noaa.gov or call
360-457-6622 ext. 28.

To subscribe or unsubscribe from this listserv send an email to
ocnmsmanagementplan@noaa.gov  with the request in the subject line.

Olympic Environmental Council Appeals City of Port Angeles CSO project

The Olympic Environmental Council (OEC) and Tyler Ahlgren, with 30 years experience working on sewage and storm water management system designs, have appealed the City of Port Angeles Planning Commission shoreline conditional use permit (SCUP) and the City’s determination of non significance (DNS) for a “pipe and treat” sewage-storm water collection system along the Strait of Juan de Fuca shoreline to minimize combined sewer overflows (CSO). The City was formally informed of the appeal on Tuesday, January 25, 2011.

The SCUP approved at the January 12th Port Angeles Planning Commission meeting allows the construction of pipes from downtown to the waste water treatment plant (WWTP) and the newly acquired 4.8 million gallon tank, located on the former Rayonier Mill site. These facilities are designed to hold peak system flows during heavy rain periods, to prevent most sewage overflows into public waters.

The appellants, who were present and provided testimony during the Planning Commission hearing, believe the Commissioners were not provided accurate information about the project, it’s goals and impacts. During the deliberations, the Commissioners themselves complained of the complexity of what they were told, complained that the project was being presented ” ..in bits and bites,” and by their questions and comments, made it clear they did not understand what they were voting on.

“We agree that the overflow problem is serious, ” said Darlene Schanfald, representing the OEC. “However, we are disappointed and chagrined that the City and the WA State Department of Ecology have agreed to spend taxpayer dollars to fund a 19th-early 20th century approach and build it in a designated flood-tsunami zone.”

The City of Port Angeles has termed their pipe and treat approach “fastest, cheapest.” However, the nearly $50M project is not being built as the “best, safest, and long term” system. It’s not credible environmentally or economically.

The City recognizes the overflow problem is because storm water is getting into the sewage collection system, mostly due to “Inflow and Infiltration” (I&I), seepage into sewer pipes through holes, cracks, joint failures, and faulty connections. Virtually every city experiences this problem, and most have ongoing budgeted programs to fix the leaks.

Port Angeles has been required by the WA State Department of Ecology through its NPDES permit to identify and fix all sources of I&I. The appellants believe Port Angeles has not complied with these existing permit requirements, resulting in the current CSO issues.

“The City can solve these overflow problems without the huge, budget busting project it currently is pursuing,” said Tyler Ahlgren. “The I&I sources need to be identified, prioritized for inflow volumes, and fixed. This would save big money.”

“The City should hire staff to permanently fix the problem and not create a scenario that will allow continued overflows,” said Schanfald, noting that the current City project anticipates continuing overflows. “Closure of the downtown trail would then not be necessary. And overflows would cease, as would alerts to stop fishing, swimming and other recreation.”

Ahlgren added, “The solution is simple. Stop the stormwater from getting into the sewage lines and there will be no more waste water overflows into the Strait. No one disputes this.”

#

Terra Cognita – Student-written environmental news report

Here’s the latest newsletter by the students of Dan Lieberman’s class at the Skills Center Natural Resources Program! Great job! Wish I had more time to chat today at the showing of the Voices.

TerraCognitaWinter2011Web

Appeal filed against Nippon biomass plan – PDN

—–
1/20 Peninsula Daily News
State appeal filed against Nippon biomass plan; foes await summer hearing on Port Townsend mill biomass upgrade
By Tom Callis
Peninsula Daily News

The second round of appeals for a biomass energy project in Port Angeles has begun, while opponents await a separate state hearing on an appeal filed in November against a biomass project proposed in Port Townsend.

Six of the seven environmental groups that lost an appeal of the shoreline substantial development permit that the city of Port Angeles gave Nippon Paper Industries USA are taking their case to the state Shoreline Hearings Board.

More at
http://www.peninsuladailynews.com/article/20110120/news/301209982/state-appeal-filed-against-nippon-biomass-plan-foes-await-summer

—-

Biomass clear of EPA rules for 3 years

Ed: I am looking into who in our delegation was petitioning the EPA to do this, and apparently Representative Van De Wege and Lynn Kessler were part of the group that asked for this. There appears to be a backstory here, and I’m contacting some individuals who gave them the technical reasons to ask for the deferal. More to follow as the week progresses.

————————————————-
1/17 Peninsula Daily News – Biomass clear of EPA rules for now as agency defers action for 3 years for analysis
By Tom Callis
Peninsula Daily News

Wood-burning facilities will not be regulated under the Environmental Protection Agency’s new greenhouse gas regulations that went into effect earlier this month, the federal agency announced last week.

EPA said it will defer further action on the matter for three years while it analyzes whether the burning of wood waste to produce electricity, among other uses, can really be considered “green.”

The move came after proponents of biomass energy, including Washington state officials and some members of Congress, protested the inclusion of biomass projects under the new regulations.

More at
http://www.peninsuladailynews.com/article/20110117/news/301179997/biomass-clear-of-epa-rules-for-now-as-agency-defers-action-for-3

Video – Elwha River at Stage 3 Flood Alert

Check out John Gussman’s new video, The Power of Water, taken yesterday on the Elwha at full stage 3 flood alert. An amazing couple of minutes of video of the power of water.

http://vimeo.com/channels/salishseavideos

Port Angeles sets hearing for challenge to proposed Biomass Incinerator

December 2, 2010Contacts:
Rachael Paschal Osborn (CELP) – 509-954-5641
Diana Somerville – 360-452-1212
Darlene Schanfald (Olympic Environmental Council) – 360-681-7565

Port Angeles sets hearing for challenge to proposed Biomass Incinerator

Protecting Elwha River flows, human and environmental health prompt conservationists to challenge City decision

LINK:  Conservationists’ Opening Legal Brief

WHO:  A coalition of seven conservation groups — the Cascade Chapter of the Sierra Club, No Biomass Burn, Port Townsend Air Watchers, the Center for Environmental Law and Policy, the World Temperate Rainforest Network, the Olympic Forest Coalition, the Olympic Environmental Council

WHAT:  The conservation groups are challenging a decision by the City of Port Angeles to permit Nippon Paper Company to build a biomass (co-generation) incinerator at its plant on the shoreline of the Port Angeles harbor, just north of Olympic National Park.

WHEN:  Monday, December 6 at 6:00 pm

WHERE:  City Council Chambers,  321 East 5th Street, Port Angeles, Wash. 98362

WHY:  The coalition members appealed the City’s permit decision because they have multiple concerns about the impacts of the proposed project, including:
Drawing millions of gallons of water every day from the Elwha River that flows from Olympia National Park.  The nation’s largest dam removal project is about to begin to restore salmon runs.  The permit for the Nippon plant would divert water from the Elwha River, endangering salmon runs and undoing the purpose of the dam removal.
Threatening the sustainability of forest ecosystems.
Increasing air and water pollution that will impact people, wildlife, and aquatic life in fresh and salt waters.
Negatively impacting public access to and enjoyment of the shoreline and popular Waterfront Trail.
Adding more carbon dioxide and other greenhouse gases from the proposed plant and associated truck traffic.

Retiree ‘matriarch’ of North Olympic Peninsula environmental community

Editor note: If you are a recent resident to the Olympic Peninsula, you should read this whole article to better understand the history of the last 25 years on this place. The hard fought battles for Protection Island by Eleanor Stopps, and the ones discussed in this article about Dr. Eloise Kailin are history that is rarely available on the Internet. Enjoy.

*11/28/10 Peninsula Daily News

Retiree ‘matriarch’ of North Olympic Peninsula environmental community

By Jeff Chew
Peninsula Daily News

SEQUIM — Dr. Eloise Kailin helped fight against a nuclear power plant on the Miller Peninsula east of Sequim — and won.

That was in 1973 and led to the formation of the nonprofit Protect the Peninsula’s Future, the North Olympic Peninsula’s longest-standing environmental group.

Today, the group tackles issues affecting health, wildlife habitat and quality of life in the region, while Kailin remains active in environmental battles while sharing a 4-acre farm off River Road with her son, Harvey, where the two have built a commercial kitchen to produce apple butter.

Bob Lynette, a retired conservation lobbyist and renewable energy consultant who has worked with Kailin on the PPF board for 12 years, sees the 91-year-old retired physician as the original driving force behind Peninsula environmental activism.

Read the whole story at: http://www.peninsuladailynews.com/article/20101128/news/311289983/retiree-matriarch-of-north-olympic-peninsula-environmental-community

High school students turn drained lake into classroom – King 5

http://www.king5.com/news/environment/Lake-Mills-Elwha-dams-classroom.html

by GARY CHITTIM / KING 5 News

KING5.com

Posted on November 8, 2010 at 6:44 PM

 

PORT ANGELES, Wash. — A group of Seattle High School students are among the first people in over 80 years to walk on the bottom of Lake Mills.

The lake is being drained in preparation for removal of the two Elwha dams scheduled to next fall. The draw downs are the most visible steps so far the in the 20-year process of approval for the removal.

The Nathan Hale High School team was invited to study the lakes, dams and rivers by the Olympic Institute, an environmental education group that hopes the students will help the story of the largest dam removal project in U.S. history. The students are measuring the PH, flow and sediment levels in the river now so they compare them to levels after the removal.

 

Garth Foss helps guard Strait of Juan de Fuca -PDN

11/7 Peninsula Daily NewsDAVID G. SELLARS

GARTH FOSS, THE green and white tug that is as common a sight in the Strait of Juan de Fuca as the pilot boats, oil tankers and cargo ships, is one of the most powerful tugs in the world. Known within the industry as an enhanced tractor tug, she was designed and built to be primarily responsible for providing escort and vessel assist services to oil tankers as they transit Puget Sound. She is 155 feet long and has a 46-foot beam.

More at http://www.peninsuladailynews.com/article/20101107/news/311079986/david-g-sellars-on-the-waterfront-garth-foss-helps-guard-strait-of

New beach for Port Angeles voiced at idea session – PDN

10/22 Peninsula Daily News

By Tom Callis
Peninsula Daily News

EDITOR’S NOTE — Click to see the 43-page presentation to the Port Angeles City Council on the proposed Port Angeles Waterfront and Transportation Improvement Plan: http://issuu.com/peninsuladailynews/docs/ptcitycouncil.3.15.00

PORT ANGELES — The idea of establishing a beach east of the Valley Creek estuary received enthusiastic support from the City Council on Thursday during a discussion of a proposed waterfront and transportation improvement plan.

David Roberts, a state Department of Natural Resources aquatic lands assistant manager, suggested creating a beach there during the public comment portion of the meeting.

The shore between Oak Street and the estuary is one of the areas slated for a makeover under the plan, which focuses on the waterfront but also will result in new entryway monuments on the west and east entrances to Port Angeles, new “wayfinding” signs to direct traffic and pedestrians to points of interest and shopping, and a citywide transportation study.

More at
http://www.peninsuladailynews.com/article/20101022/NEWS/310229988/new-beach-for-port-angeles-voiced-at-idea-session-and-click-to-see

Lowering of Lake Mills starts today – PDN

10/20 Peninsula Daily News
Peninsula Daily News

OLYMPIC NATIONAL PARK — Lake Mills behind Glines Canyon Dam will be lowered 18 feet starting today as part of the preparation for the removal of the dam and another on the Elwha River.

Bureau of Reclamation dam managers will lower the water level by about 1 ½ feet every day until it is about 18 feet lower than normal, Olympic National Park spokeswoman Barb Maynes said.

The water will be released by opening the dam’s spill gates, Maynes said.

More at
http://www.peninsuladailynews.com/article/20101020/news/310209973/lowering-of-lake-mills-starts-today

Coast Guard Bill – Huge win for protection of the Strait!

-Update – Chris Dunagan goes into detail on this bill. This is really significant and is one of the most important pieces of legislation to help us protect our coasts since the Magnuson Act. Read the overview at

http://pugetsoundblogs.com/waterways/2010/10/10/coast-guard-bill-covers-safety-and-budget-issues/

President Obama is expected to sign a sweeping authorization bill that reorganizes U.S Coast Guard operations, increases maritime safety rules and calls for improved oil-spill prevention and response in the Strait of Juan de Fuca. 

This bill has been blocked for over a year, so this is great news. It is a great win for everyone who fishes, or makes a living off people enjoying the Straits. Thanks are in order to Senator Cantwell and Senator Murray, as well as all the other people behind the scenes who pushed this, like Fred Felleman,  People For Puget Sound, The Makah Nation, and many others. This has been a major effort for over 10 years. It is sad that it took losing the Gulf to get this over the hump, but we are there. Now to the House for a final vote. This also will help better protect fishermen who have the most dangerous job in America.

9/30 Seattle Times
Bill OK’d that overhauls fishing-industry safety, protects Sound
Seattle Times staff
The U.S. Senate late Wednesday night unanimously approved a Coast Guard authorization bill that includes a major overhaul of federal fishing-industry safety laws, and measures to strengthen efforts to prevent Puget Sound oil spills.
The bill was expected to soon be approved by the House of Representatives and sent to the President Obama for signing.
“It has been nearly four years in the making to get this important legislation through Congress,” said Sen. Maria Cantwell, D-Wa., who chaired a Senate subcommittee with jurisdiction over the legislation. “This bill establishes new safety laws on oil-spill prevention and fishing vessel safety so that we can continue to operate in these pristine waters in a safe and effective manner.
…. The oil-spill provisions will include measures to expand oil-spill response capabilities around the entrance of Strait of Juan de Fuca and increase the role of Indian tribes in the response effort. The legislation will result in oil-spill response equipment, including booms and barriers, positioned along the strait.
Approximately 600 oil tankers and 3,000 oil barges travel each year through Puget Sound and carry about 15 billion gallons of oil to Washington refineries, according to Cantwell.
More at
http://seattletimes.nwsource.com/html/localnews/2013032351_webcoastguardbill.html

Environmental Coalition challenges Nippon’s proposed biomass incinerator on Port Angeles waterfront

Environmental Coalition challenges Nippon’s proposed biomass incinerator on Port Angeles waterfront

Seven environmental groups, including the Cascade Chapter of the Sierra Club, have filed a legal appeal of the City of Port Angeles’ approval of permit to allow Nippon Paper to build a biomass incinerator at its shoreline plant on the popular Waterfront Trail along Ediz Hook.

No Biomass Burn, Port Townsend Air Watchers, the Center for Environmental Law and Policy, the World Temperate Rainforest Network, the Olympic Forest Coalition, the Olympic Environmental Council and the Cascade Chapter of the Sierra Club have joined together to take this legal action, filed October 6, 2010. 

The appeal disputes many aspects of Port Angeles’ approval of the Nippon permit, including:

*          The impact of many millions of gallons of additional water being removed by Nippon from the Elwha River each day.

*          The impact on fresh water and salt water fish, shellfish, crustaceans and other aquatic life when the river flow is reduced.

*          The impact across the North Olympic Peninsula on human health and the environmental effects of pollutants from Nippon’s proposed incinerator.

*          The climate impact of hundreds of thousands of tons of greenhouse gases emitted each year by the proposed Nippon incinerator.

*            The impact on the long-term sustainability of our forests that provide clean water, wildlife habitat, and support jobs in our local economy.

Unlike power plants that burn coal or oil or gas, biomass burning poses new threats to the health of our residents, our rivers, forests and oceans.

The Nippon incinerator is one of five biomass incinerators currently proposed for the Olympic Peninsula. Their cumulative impact raises the specter of scouring the forests clean of woody debris that naturally contribute to a healthy forest environment able to sustain wildlife, absorb rainfall and help mitigate flooding.

And it isn’t just the depletion of forest resources that has the groups concerned.

"The Elwha River needs water to support the return of the salmon," said Dr. John Osborn, Board President of the Center for Environmental Law & Policy.  "The permit we are challenging allows millions of gallons of water a day to be taken from the River for the Nippon incinerator.  Spending hundreds of millions of dollars to remove dams and then dewatering the Elwha River makes no sense."

Nippon’s smokestacks emit plumes that can be seen for miles. Local residents will be impacted and the toxic pollutants those stacks release will be carried by prevailing winds and the notoriously strong currents of the Strait of Juan de Fuca far beyond the city limits of Port Angeles.

Major increases in diesel truck traffic to and from the plant will also extend the air, water and noise pollution experienced by local residents to people and wildlife far beyond the Nippon site.

The coalition of environmental groups share a commitment to protecting our environment, including its impact on human health. The coalition’s appeal insists that Port Angeles overturn its approval of the Nippon incinerator and that Port Angeles correct many defects in its analysis of the Nippon incinerator proposal.

Elwha River flows through man-made channel for dam-removal preparation

9/30 Peninsula Daily News

By Rob Ollikainen
Peninsula Daily News
OLYMPIC NATIONAL PARK — A river runs through it. Well, most of it does.
About 80 percent of the Elwha River is flowing though a man-made pilot channel at the southern end of Lake Mills where the river meanders through a delta and pours into the broad lake.
Crews finished digging the pilot channel on Tuesday and relocated a log jam near the head of the delta on Wednesday to direct the flow into the new channel, Olympic National Park Spokeswoman Barb Maynes confirmed.
More at
http://www.peninsuladailynews.com/article/20100930/news/309309991/elwha-river-flows-through-man-made-channel-for-dam-removal-preparation

Trees felled in preparation for removal of Elwha dams – PDN

9/19 Peninsula Daily News

By Chris Tucker and Paul Gottlieb
Peninsula Daily News
OLYMPIC NATIONAL PARK — The southern end of Lake Mills looks idyllic.
With towering mountains, a dense, green forest and the quietly burbling, crystal-clear waters of the Elwha River flowing nearby, one might imagine this area in Olympic National Park has remained essentially unchanged for 1,000 years.
Loud, electronic beeping noises disrupt the peace.
They signal the approaching end of the Glines Canyon Dam, construction of which created the lake, and the demise of its sister edifice, the Elwha Dam, downriver.
More at
http://www.peninsuladailynews.com/article/20100919/NEWS/309199991/trees-felled-in-preparation-for-removal-of-elwha-dams

Public Hearing on Nippon Biomass Project – 9/22 6PM

If you live in Port Angeles and are concerned about the proposal by Nippon to build a biomass electrical generation facility at their plant, now is the time to come out and hear the latest, get updated, and express your concerns, if you have them.

The meeting will be held at the City Council Chambers, 321 E. Fifth St.

http://www.ci.port-angeles.wa.us/publicNotice.htm is the public notice. It seems like the only consideration at this meeting is to allow it to have a height variance…? Or is this just one item to be discussed?

The biggest concern I’ve heard is that the assumptions of biomass fuel availability  do not match up with demand from the facilities. Apparently, according to the EIS by Nippon,  the requirement for the biomass facility is 90,000 bone dry tons (BDT) and the current slash volume burned in Clallam county is only 30,000 BDT. Add to that the demand from the Port Townsend mill biomass project (some will have to come from Clallam because much of the pulp today comes from Clallam), and there is an apparent need to harvest a great deal more trees on the Olympic Peninsula than we are today. This is not addressed by Nippon in their EIS, but  punted to DNR. I have not heard of a response to this from DNR at this point. It seems a major issue worth addressing. Do they expect to harvest 3 times the trees (or more) to feed the electrical generation demands of Nippon and PT Paper?  Is this all really carbon neutral? Or is this simply a way to allow industry to neutralize their costs of electrical generation? I don’t know the answer, and am unsure who does at this point, as this is all very experimental.  I don’t doubt it will create much needed jobs here. I don’t doubt that it will generate electricity, and I don’t clearly understand if the community benefits from that at all (they are stating they will sell the electricity to Bonneville, which means that this will be sold to California, which has never been in doubt). Does Port Angeles or Port Townsend really benefit from the generation of electricity at these plants, other than a few jobs? It’s really not clear at this point. But what is clear, is that it appears they will need to cut way more wood to make this work.