Lowering Lake Mills begins today; preparation central to clearing Elwha River of dams – PDN

9/9 Peninsula Daily News
By Paul Gottlieb
Peninsula Daily News
OLYMPIC NATIONAL PARK — Lake Mills will be lowered 5 feet starting today in the beginning of the end for the reservoir behind Glines Canyon Dam west of Port Angeles — and an essential part of preparations for the demolition of the two dams on the Elwha River.
On Wednesday, workers finished barging a big-bucket excavator, a crane and several fuel tanks to a delta of at least 13 million yards of sediment at the southeast portion of the lake.
The delta was created where the Elwha River slows down as it empties into Lake Mills’ broader boundaries.
More at
http://www.peninsuladailynews.com/article/20100909/NEWS/309099988/lowering-lake-mills-begins-today-preparation-central-to-clearing

%d bloggers like this: